Lakes of Bendakaluru

Satellite view: Esri, Maxar, Earthstar Geographics

Krishnaraja Puram Kere

Also called Gangashetti kere/ Devasandra kere, Krishnaraja puram kere-1, Gangashetti kere

Kere, a large tank, in K.R Pura ward, Bengaluru East

See it on the map
Size
12.3 acresAbout 7 football pitches
Rank by size
650th largestOf 1,621 lakes that still exist
Valley
Hebbal
Who looks after it
BBMPBruhat Bengaluru Mahanagara Palike
Water quality
Fit only for irrigationTested Jul 2026
Built over
3% of the lakeSatellite, 2021. The 2018 survey found 20% encroached.

Through the years

Nothing on record for 1905 to 1926, 1928 to 1954, 1956 to 1977 and 1979 to 1983.

The records listed below, drawn on one line from 1904 to 2026.
  1. 1904

    Built

    As the 2018 lake survey records it

  2. 1927

    On the survey map

  3. 1955

    On the U.S. Army map

    Compiled from Survey of India maps of 1945-46

  4. 1978

    On the survey map

  5. 1984-2021

    Held water until 2017

    Water in 2% of all satellite passes, 1984-2024

    0% of its water area has since gone dry; 18% is new water

    Floating weed looks like dry land to this record, so a weed-covered year can read as dry

  6. 2013

    Restored

  7. 2017-2018

    In the water bodies census, not marked as encroached

    This census's status marks are often wrong

  8. 2017-2025

    Mostly built on or bare from 2022

    About three in four of these readings are right, so trust what holds for several years

  9. 2018

    Still there in the 2018 lake survey

    20% encroached, sewage, 21.7 acres surveyed

  10. 2024

    On the state's list of Bengaluru lakes, looked after by BBMP

  11. 2025-2026

    Tested by the state board in 15 months, most often fit only for irrigation

    Apr 2025 to Jul 2026

  12. 2025-2026

    Part open water, part floating weed after the monsoon and in the dry season

    After monsoon, Oct 2025 to Dec 2025

    • 47% open water
    • 43% floating weed
    • 10% dry or built

    Dry season, Mar 2026 to May 2026

    • 45% open water
    • 39% floating weed
    • 16% dry or built

How big it is

The records disagree on its size, so each measure is shown.

Drawn outline
12.3 acres

About 7 football pitches

2018 lake survey
21.7 acres

About 12 football pitches

End to end
372 m

The longest straight line across the outline

Deepest point, 2018
3 m
Kind of lake
Kere, a large tank

How clean the water is

Latest test
Fit only for irrigation

Fit only for irrigation, cooling and waste disposal. Class E on the state board’s scale from A, the cleanest, to E.

Tested Jul 2026

Class each month, tested 15 times since Apr 2025
Fit only for wildlife and fish: 7 months. Fit only for irrigation: 8 months. Every month is listed in the readings below.
Drinkable after disinfection
Fit for bathing
Drinkable after treatment
Fit only for wildlife and fish
Fit only for irrigation
How it looked in 2018
Sewage
What pollutes it, 2018

Sewage

Sewage flows in, 2018

From the south

Inlet and outlet tests, 2017-18
1 readings
Every reading
Show every reading

Latest test, Jul 2026. Too low to measure: boron, carbonate, dissolved oxygen, nitrite, phenolphthalein alkalinity

MeasureUnitValue
Water temperature°C25
pH7.4
ConductivityµS/cm980
BODmg/L12
Nitratemg/L as N3.8
Faecal coliformMPN/100mL21,000
Total coliformMPN/100mL46,000
Bicarbonatemg/L224
TurbidityNTU16
Total alkalinitymg/L as CaCO3224
Chloridemg/L168
CODmg/L131
Kjeldahl nitrogenmg/L as N2.6
Ammonia nitrogenmg/L as N2
Total hardnessmg/L as CaCO3268
Calcium hardnessmg/L as CaCO3140
Calciummg/L56
Magnesium hardnessmg/L as CaCO3128
Magnesiummg/L31.1
Sulphatemg/L43
Sodiummg/L98
Dissolved solidsmg/L666
Suspended solidsmg/L22
Phosphatemg/L0.29
Potassiummg/L6
Fluoridemg/L0.42
Sodium share%36
Sodium adsorption ratio2.6
Orthophosphatemg/L0.87

Every month the state board tested it

MonthClassDissolved oxygenmg/LBODmg/LFaecal coliformMPN/100mLTotal coliformMPN/100mLSource
Jul 2026E1221,00046,000See source
Jun 2026E3.6127909,200See source
May 2026E1.5113,1008,400See source
Apr 2026D4.266303,500See source
Mar 2026E2.5322603,500See source
Feb 2026D5.153209,400See source
Jan 2026D643902,800See source
Dec 2025E1.6363,90014,000See source
Nov 2025E2.7225804,300See source
Oct 2025E2.5272603,500See source
Sep 2025D5.272105,400See source
Aug 2025D5.882403,500See source
Jul 2025D57110790See source
Jun 2025D5.361702,400See source
Apr 2025E2.4222,20011,000See source

Inlet and outlet tests, 2017-18 lake survey

DateWhereWater temperature°CLight transparencycmpHConductivityµS/cmDissolved solidsmg/LSuspended solidsmg/LTurbidityNTUDissolved oxygenmg/LCODmg/LBODmg/LTotal phosphateKjeldahl nitrogenmg/L as NTotal coliformMPN/100mL
2017-11-2921.8156.5445268297.30.8327.70.121,600

How much is built over

Built inside the outline
3%

From satellite land cover, 2021

Encroached area, 2017
4.97 acres

Reported by the state legislature’s committee on lake encroachment

Encroached by

The public

Taken for

Shed, houses

Where it is encroached

On the east, south and north-east side

Dumped in it

Garbage dump

Land within 500 m

60% built, 34% trees, 3% shrubs, 2% crops, 0.6% bare ground, 0.5% grass

From satellite land cover, 2021

Who looks after it

Looked after by
Bruhat Bengaluru Mahanagara Palike

BBMP

Where its water comes from and goes

Valley
Hebbal

The river basin its water drains to

Catchment
1.4 km²

The land that drains into it

Fed by, 2018 survey

Rainfall

Built parts, 2018 survey

2 inlet drains, 1 overflow weir, no sluice gates, 3 culverts, no check dams and 1 island

Used for, 2018 survey

Fishing and cattle feeding

Nearest sewage treatment plant

KR Puram Phase I 20MLD Sewage Treatment Planet

1.3 km away, treats 20 million litres a day

What lives here

Animals seen, 2018 survey

Birds and butterflies

Water plants, 2018 survey

Emergent and floating

Weed cover, 2018 survey

Partial

Around it

Around it in 2018

BMTC bus depot, vacant land, settlement & sheds

Photos

No photos of it on Wikimedia Commons yet.

Where it is

Ward 14
K.R Pura

ಕೆ ಆರ್ ಪುರ

Bengaluru East corporation, K.R. Pura assembly seat

Village
Krishnaraja puram (Kasaba)

KR Puram hobli, Bengaluru East taluk, Bengaluru Urban district

Land survey numbers

58 (K.R.Puram), 46 (Dyavasandra)

Height above sea level
892 m
Coordinates

13.0051° N, 77.6936° E

Read more

Its number in each record
ATREE lake map
49
2018 lake survey
BUBEKRkrp_kr2-727
Lake Development Authority
LDA313
KGIS tank map
656
Water bodies census
2/12/002/253189/026026/002
City lake monitoring site
157